Implementation of Compensation for Land Acquisition in the Construction of 150kv SUTT Tower for Public Interest

Lalu Caesar Nebula, Lalu Husni, Arba Arba

Abstract


Electricity development really needs land. The government of the share permit holder seeks to improve service to the community by building large-scale power plant centers and transmission or High Voltage Air Channel networks (abbreviated in Indonesian as 150 kV SUTT) as a medium to deliver electricity to load centers or to customers. This article describes how to carry out compensation for land acquisition in the construction of the 150 kV SUTT tower for public interest. This study uses juridical empirical method as well as statute and conceptual approaches. The results of the study indicated that the process of communication or discussion between interested parties is carried out to achieve understanding and agreement in determining the location of land acquisition activities in the construction for the public interest. After an agreement in the public consultation for location determination occurs, the assessment of compensation is carried out by an assessment team formed by the governor through the local National Land Agency. Furthermore, a new assessment is carried out through discussion to determine the value of compensation in fulfilling the rights of the community whose land is affected by land acquisition for the construction of a 150kV SUTT tower.


Keywords


Land Acquisition; Compensation; Power Plant

Full Text:

PDF

References


Firman, T. (2004). Major issues in Indonesia's urban land development. Land Use Policy, 21(4), 347-355.

Indra, I. B. P. (2011). PPP Policy and Regulation in Indonesia. Republic of Indonesia National Development Planning Agency.

Krishna, V. V., Kubitza, C., Pascual, U., & Qaim, M. (2017). Land markets, property rights, and deforestation: insights from Indonesia. World Development, 99, 335-349.

Limbong, B. 2015. Land Acquisition for Development, Third Print, Jakarta: Margaretha Pustaka.

Permatasari, K. A. (2013). Implementation of Regulation of the Minister of Mining and Energy Decree 975.K/47/Mpe/1999 in Relation to the Provision of Compensation for Land and Buildings in the Construction of Transmissions by the State Electricity Company Limited Liability Company, (Thesis, Diponegoro University)

Siregar, M. (2018). Land Acquisition in the Context of Accelerating Electricity Infrastructure Development in an Effort to Realize a 35,000 MW Project, (Thesis, University of Hassanuddin,).

Sutedi, A. (2008). Implementation of the Principles of Public Interest in the Land Acquisition for Development, Jakart: Sinar Grafika.

Syah, M. I. 2015. Land Acquisition in the Development for Public Interest, Jakarta: Jala Permata aksara.

Zaman, M. (2002). Resettlement and development in Indonesia. Journal of Contemporary Asia, 32(2), 255-266.




DOI: http://dx.doi.org/10.18415/ijmmu.v6i3.770

Refbacks

  • There are currently no refbacks.


Copyright (c) 2019 International Journal of Multicultural and Multireligious Understanding

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.

International Journal of Multicultural and Multireligious Understanding (IJMMU) ISSN 2364-5369
https://ijmmu.com
editor@ijmmu.com
dx.doi.org/10.18415/ijmmu
facebook.com/ijmmu
Copyright © 2014-2018 IJMMU. All rights reserved.